Example 1 — Paving bed
- …
1.26 m³
…
Work out sand for paving beds, levelling or mixes — volume, tonnes and bags with waste %.
Moisture changes mass a lot at the same volume. Treat results as a purchasing estimate. Also see gravel and cement in mortar.
Enter data and click Calculate.
V = length × width × depth × (1 + waste/100). Mass = V × density. Bags and bulk bags as for gravel.
Density stays in kg/m³ even with US length units — common for bulk deliveries. Mass is an estimate: moisture and compaction can change it.
1.26 m³
…
1.62 m³
…
0.63 m³
…
…
…
…
…
…
…
…
…