Pricing rules cost in this calculator is evals outside cache plus an incident. With 80000 evals, 0.0004 USD/eval, 70 cache %, 12 failover/d, 400 incident USD the result is $409.74 | 24,360 eval.
net = vol × (1 − cache%) + failover × 30. cost = net × rate + incident. The formula uses cache and incident.
$409.74 | 24,360 eval is not a live pricing engine. Another set of numbers gives $151.85 | 6,180 eval, and a further set gives $843.56 | 72,600 eval. Empty scenario fields do not change the result.
Orchestration cost answers a different question. MCP cost does too. Here 80000 evals, 0.0004 USD/eval, 70 cache %, 12 failover/d, 400 incident USD leave $409.74 | 24,360 eval.
Type 80000 evals, 0.0004 USD/eval, 70 cache %, 12 failover/d, 400 incident USD and click Calculate. Two more ready sets sit under the form: $151.85 | 6,180 eval and $843.56 | 72,600 eval.
Other numbers on the same labels move the result. The first example gives $409.74 | 24,360 eval.